

This technology is applicable to industrial and civil construction of cast-in-situ concrete frame and cast in place concrete columns, beams, plates, shear walls and other formwork works. It is a widely used template type and system in china. The template system has strong versatility, flexible assembly, convenient assembly and disassembly, high strength, high rigidity, high precision, tight joints, smooth surface, rapid assembly and can be assembled into large, mechanized construction turnover frequency (50 times), wood saving, reduce construction cost and other advantages. Scrap and waste templates can be recycled, zero waste emissions Q:Production of steel plate for bridge steel plate SPHC and Q235 which material is good? What is the difference? Represents the hot rolled steel plate (which corresponds to the cold rolled plate is SPCC) Q:What are some of the components of the combined steel template, what role? The steel template is provided with the template system which is composed of a variety of specifications of the standard steel template and the connecting piece and the supporting parts. The design of the steel formwork is 1.5 meters long or the length of 2 meters, so it can save the cost and improve the work efficiency Q:What is the steel formwork and its construction advantages Energy conservation and environmental protection. The first layer is higher than the standard layer height Q:I would like to ask, large steel formwork and the average number of square meters of a template? You can find the local rental station under the general template is charged by the day rental fees Q:Those who have these drawings, can send a copy to me, online, etc. The first layer is higher than the standard layer, the large template in accordance with the standard layer, the first part of the difference with the roof can be poured? Position of horizontal construction joint of shear wall. Q:Position of horizontal construction joint of shear wall. Q:What are the characteristics of steel formwork 5, good insulation performance, is conducive to the preservation of concrete in winter.6, easy maintenance, can be repaired in the local damage surface, when one side wear, you can flip the use of the plate. Measures because additional concrete loads or lifting forces can be safely transferred into the Even use on inclined walls is feasible without any special With SCB180 single-sided climbing formwork, circular structures can also be concreted without This leads to extremely economical solutions. Generous bracket spacings allow large-area formwork units with optimal utilization of the bearingĬapacity. ◆ Stable and cost-effective for high loads Without wall-through tie-rods, finished concrete is perfect.

SCB180 in dam construction, and to allow the transfer of high tensile and shear forces into the stillįresh, unreinforced concrete.

The M30/D20 climbing cones have been designed especially for single-sided concreting using The 1.80 m wide bracket requires only a minimum of space. The formwork is simply tilted backwards when striking takes place. Typical applications for the SCB 180 are dams, locks, cooling towers, pier heads, tunnels, and bank vaults. With CNBM SCB 180 climbing systems, the loads from the fresh concrete pressure are transferred through the brackets by means of V-strongbacks and compression braces into the scaffold anchors.
